• Mon - Fri 8:00am - 5:00pm

Mongoose 123 Skid Unit

123 Series

Mongoose 123 Skid Unit

The Mongoose 123V is a wheel-less version of the proven Mongoose 123 trailer jetting unit. This compact skid was designed for slide-in within a service van, mounted for access at either the side or rear door. The Mongoose 123V was designed to clean sewers up to 6 inches in diameter. Mongoose 123V skid units come standard with a 150 gallon water tank; an optional 200 gallon water tank is available.

Mongoose 123V Skid Units are equipped with a 27 HP industrial electric start gasoline engine, an electric rewind hose reel with 250 feet of 3/8″ high pressure jetting hose and Mongoose Run-Dry pump. Each unit comes with a Penetrator nozzle, a Flusher nozzle and a finned drain jet extension. Equipped with optional small diameter hose kits, the Mongoose 123 can easily clean lines from 1 1/2″ to 3″ in diameter. A full function wireless remote control system is an available option. Mongoose 123 V Skid Units can be shipped via common carrier and easily installs within most vans with six bolts.

STANDARD FEATURES

  • Nema 4 Control Panel
  • Optional Wireless Remote Control
  • 200 Gallon Full Baffled Water Tank
  • Industrial Electric Start Gasoline Engine
  • Electric Rewind Hose Reel with 250′ of 3/8″ Hose
  • 2″ x 6″ Main Frame With Forklift Slots
  • 3-Cylinder Run-Dry Pump
  • Easy to Read Pressure Gauge
  • Complete Nozzle Kit with 4 fixed drain jets, 1 rotor jet, and tip cleaner

Contact Information

4035 Roberts Road,  Island Lake, IL 60042, USA
PHONE:
847-526-5671

Message to Jet Vac Environmental

    Your Name:

    Equipment Name

    Your telephone number:

    Email:

    Your Message

    Request Info
    Contact us for your Free Price Quote or Call 847-526-5671
    Make Mongoose Jetters
    Condition New
    type Jetting Unit, Trailer Jet
    Year 2017
    Max Water Capacity 200 gal
    Max Hose Capacity 250'
    Hose Size 3/8"
    Min HP 27 HP
    Pump Pressure 12 GPM @ 3000 PSI
    Financing calculator
    Vehicle price ($)
    Interest rate (%)
    Period (month)
    Down Payment ($)
    Calculate
    Monthly Payment
    Total Interest Payment
    Total Amount to Pay